Storg BvbA
The Storg BvbA plant has the following scope of supply
2x demountable mesophilic digisters
1x thermophilic digester consisting of concrete. However, only the
roof can be dismantled
3x Buschmann mixers incl stainless steel piping, control cabinet and
frequency controllers
1x Active carbonfilters
1x Guascor HGM560 (1,300kWe)
1x Waukesha APG1000 (1,000kWe)
1x Cummins Diesel (1,000kWe)
1x Gas pretreatment line + gas analyses stations
2x Transmorfators (1250KVa + 2500KVa)
4x Emergency coolers
2x Hygienysation line (15.000L Incl mixers and HEX inside tanks
1x Scales
1x Hydro unit
1x Stainless steel mixing tank 10,000L incl mixers
3x Silo (150T)
1x Command block compressed air system + Spare parts
Walking floors, piping, grinders, gas analyzer, Vogelsang pumps,
flowmeters, shredders, HDPE Urea tank, waterlocks and control boxes,
screws are included in this price D5162704 too.
There is an option to also take buildings and other attributes. The
biogas plant will not be operational until July 2024.
There is an option to supply other CHPs or to overhaul the old
CHPs.
The plant is open for inspection and everything is negotiable!
Biogas plant, syngas, natural gas, gasgenerator, gas generator, CHP,
WKK, Combined heat and power, Cogeneration unit