Scope of delivery of the CT Scan Unit:
Separation of the CT control room from the CT examination room by lead
glass pane
Patient access corridor
Separate air conditioning in the CT room, control room and corridor
Hygiene concept
All 3 areas have their own ventilation (CT room, control room and
corridor).
The control room (seat of the MTRA for CT operation) is ventilated
from the outside.
The air in the control room has overpressure and escapes into the
corridor.
The CT room has its own ventilation from the outside, air escapes back
to the outside, and the air flow is in balance.
The corridor also has its own ventilation.
Door widths 90 cm.
A step to enter the container.
Technical questions from the customer:
Where is the exact exit and entry point for the network and electrical
equipment at the container?
Container door (short container side)
Are point foundations allowed as foundations instead of strip
foundations?
Yes
How is rainwater drained from the container? If it is deliberately
discharged – where and how?
No special drainage is planned.
The customer plans to lay a fiber optic connection. Is there still
room for installations in the patch panel area and are there
sockets?
Sockets are available at various points throughout the container.
The customer plans the container connection in the SV network (special
supply network). If the worst comes to the worst, this means behind a
diesel generator. What is the starting current of the CT /
container?
The maximum electrical connected load is 140 kVA. We demand a fuse of
the electrical supply line of 200 A.
What equipment for storing material is already available in the
container?
There is a E5122986 storage cupboard.
What are the heating capacities of the air conditioning systems?
With regard to the outside temperature and the two types of air
conditioning systems, the following values are obtained:
Large air conditioning system: Up to 15°C heating capacity and up to
20°C cooling capacity above/below outside temperature.
2 x Small Air Conditioner: Up to 10°C heating capacity and up to
20°C cooling capacity above/below outside temperature.
The highest heating temperature is not known and is certainly related
to the frequency of opening the doors.
Is drilling into the container allowed? If so, where/where not?
It is not allowed as the lead shielding could be damaged. There is
also a risk that the container could leak.