Cabine |
Full protection cabin |
Main drive |
Drive power (100% DC) 20 kW |
|
Drive power (40% DC) 20 kW |
|
Speed range - 12000 rpm |
|
Spindle taper HSK-A 63 |
NC rotary table with pallet changer |
Type of Measuring system Direct measuring
system |
|
Table surface 500 x 500 mm |
|
Centre bore 50 mm |
|
Maximum load (table centre) 600 Kg |
|
Rotation speed max.4. Axis 40 rpm |
|
Distance between T-Slots 100 mm |
|
Number of Slots 5 |
|
Slot width 14 mm |
|
4. Axes (swivelling range) 360 x 0,001 degree |
Spindle taper HSK-A 63 |
Spindle taper for HSK-A 63 to DIN 69893 (incl.
adaptation working spindle, tool changer and tool magazine) |
Tool magazine, chain vert., 80
pockets |
Tool magazine Vertical chain magazine with 80
tool pockets |
Production package 40 bar/23 l/min, 980 l
tank |
Production package Coolant unit 980 l / 259
gallon, paper band filter Internal coolant supply 40 bar/23 l/min /
580 psi/6 gallon/min through spindle centre (AD) roof chip rinsing 300
l/min / 80 gallon/min (theoretical pump D41252871 performance)
through jets with n |
Direct measuring system X,Y,Z |
Direct measuring system X-, Y-, Z-axis, Positional
uncertainty: P=0.006 mm / 0.00024 in (VDI/DGQ 3441) |
Tool identification (TDS) |
Tool identification (Tool Dialogue System TDS)
Reading/Writing manually, without with a chip of Balluff BIS C for
spindle |
Spray pistol with pump |
Spray pistol with pump 1 bar/40 l/min 14.5
psi/10.4 gallon/min (theoretical pump performance) |
Oil and emulsion mist separator |
Oil and emulsion mist separator Mechanical filter
Throughput volume 1,100 m³/h |
Operation panel for loading station tool
magazine |
Control panel Siemens for loading station Tool
magazine with TFT screen 8 Softkeys, alpha-numeric keyboard No
parallel operation with CNC control. |
Special equipment |
Production package such as module P-K0346, but
with 80bar and vario valve Torque support bolt solution with 3-point
system Automatic set-up station door 4/7 clamping hydraulics for
work table and Set-up station for the connection of hydraulic
Clamping |
Special equipment |
3 air lines at the setup station must be
independent from each other with valve (via switch on the control bar)
can be switched with the setup station door open can. One switch per
line (open / close) |