tarif: |
GERMANPLAST TIRE RECYCLING LINE 4 T/h <...
yeni makine
Starting product :, car, 4x4, truck tyres, agri tyres max diam. 1.400
mm and max thickness 300 mm., Final product : 80 - 100 mm.chopped
(for inceneration), 4 - 6 mm.crumbs, 2 - 4 mm.crumbs, 1 - 2 mm.crumbs,
0,5 - 1 mm.crumbs, 4 operators per shift, required space : about 45 x
25 mt., calculated on a 220 days/year 8 h/day = 7.040 T/year - 16
h/day = 14.080 T/year, Harmonized steel as a residual product.,
Average throughput rate of granulate : 4Ton/h in input, (throughput
rate depends on feeding rate and on the kind of tires), installed
power : about 900 kw used at 65%, Delivery time : about 6 months from
confirmation, Main machines:, Debeader - automatic (45-50 tyres /h),
for truck tyres only, feeding conveyor belt, Dual shaft shredder 1.500
mm wide, transport belt, discs screen, transport belt, transport belt
for fine material, transport belt to return oversized material to
shredder, n.2 High speed granulators 1.600 mm wide rotor, n. 2
extraction belts, vibrating table, Overbelt magnetic separator, metal
fraction discharging belt, transport belt, Buffer with inbuilt screw
conveyor, Chopped material is stored in the buffer for further size
reduction, separation and cleaning.,
----------------------------------------------------------------------
----, screw to fine granulator, Fine granulator 2.000 mm wide rotor,
extraction screw for material, textile fiber separation table, 4-steps
vertical screening unit, n.4 transport screws, n.3 G41237941
densimetric tables for crumb cleaning, dust cleaning unit, n.4
transport screws to big bag loading stations, The dust reducing system
acting on material transport and textile separating table consists
in:, connection pipes, cyclone, dust reducing filter, vacuum hood,
Control panel for management of the whole line, The line can be
completed with a
[PULVERIZER](.germanplast.eu/listings/4596835-rubber-pulverizing-plant
). to reach the finest granulometry., installed power : 900, CAPACITY:
4 Ton/h <6 mm granulate, delivery time: about 6 months from
confirmation, Payment Terms: deposit + LC seller offer No. resale
GEDP102
|