We use cookies to optimize our website for you and to be able to continuously improve it. By continuing to browse the site you are agreeing to our use of cookies.
Disagree
SGT 400 YOC 2010, 10.000 hours only 6 years in operation at peak load conserved 50 Hz 11 kV 14,300 kVA 1500 rpm still complete installed. relocation can be offered ...
220 MW SGT-600 GT Complete Power Plant Duel Fuel Gas Turbine Power Plant Gensets 220.5 Megawatts in total 6 units available, 24.5 Mw each Speed 1,500 rpm, Generator Output 11 kV, Frequency 50 Hz Average running hours 70.000 hours Gas Turbine Power Plant operated predominately on natural gas with standby diesel fuel. Can be converted to alternative fuels as heavy fuel oil . Depends on the demand and needs of the customer. Phase I (5 units, commissioned on 2007) Phase II (4 units commissioned on 2012) Routine preventive maintenance was done for all units under OEM supervision, Emission ISO Standard at 15% O₂ Original Dry Low NOX ( DLE ) Combustion Chambers ...
SIEMENS SGT800 gas only turbine Year: 2022. Brand new. OEM warranty 3 x 56MW, 60Hz No photos are available, units are still at the Siemens factory Only 3 units are available ...
Brand New , SGT 800 , 50 Hz, 54 MW Power Classic Version Fuel : Natural Gas OEM Warranty included , Installation by Siemens Power output 56.0 MW(e) Fuel Natural Gas. Frequency 50 Hz Gross efficiency 39.0% Heat rate 9,231 kJ/kWh Turbine speed 6,608 rpm Pressure ratio 21.4 : 1 Exhaust mass flow 137.2 kg/s Exhaust temperature 551 °C (1,024 °F) NOX emissions ≤ 15 ppmvd at 15% O2 on fuel gas (with DLE
Qty. 1 Second-hand power plant including boiler (BFB – boiler: bubbling fluidized bed) Mfc.: Foster Wheeler, Siemens, Raumaster, YIT Corporation, Honeywell, Built: 2001, 2002, 2006, 2009 Revision: 2009 Insulation removed in 2018 BFB Boiler – 88 MW Steam turbine – 22.5 MW Main Steam Cycle BFB boiler K7 – Some parts removed and storaged indoor at the paper mill area – Boiler is made electrically safe (cables cut) – Dry conservation ongoing since 2014 (tubes filled with nitrogen, dry air circulation) – Steam Turbine VP4 (in storage) Generator (in storage) Power Plant – Function Primary function is to produce steam for the Paper Mill reliable and economically S ...
Siemens Continuous Gas Analyzers, ULTRAMAT 5e 7MB1120-2WC2 ...
Combined Cycle Gas Turbine Power Plant 75 MW/50 Hz – Zero Hours This equipment was delivered in 2017 by an EPC contractor who selected Rolls-Royce and Siemens as main equipment suppliers. This was a greenfield project and therefore delivery contained all equipment needed for 75 MW power plant operation, like fuel gas treatment plant, water treatment plant and complete switchyard with step-up transformers Manufacturing year: 2017 Gas turbine: Rolls-Royce Trent 60, Dry Low Nox Steam turbine: Siemens SST-300 Step up tranfomers: 2 pc Alstrom 11kV to 154 kW Complete switchyard: Siemens 154 kV Nominal output 100%: 60 MW + 15 MW Max efficiency: Single cycle 42 %, combi cycle 54 ...
Steam turbine Siemens SST400 Year: 2011 Disassembled and put in a storage. Very low working hours. Power:30mW Voltage:10.5kV/50Hz Fuel: Biomass Generator: SGen5-100A-4P Turbo gear unit Flender-Graffenstaden TX80/3 Transformer Siemens S10-40000/110 Condenser Full set of manual books No boilers, no voltage control cabinet (7) Steam turbine Siemens SST-400 Year: 2011 Never used and never installed. Still in original wooden crates. Packing lists. 7 sets available Power:30mW Voltage:10.5kV/50Hz Fuel: Biomass Generator: SGen5-100A-4P Control system Accessories Full set of manual books No boilers Price: on request
Dear Ladies and Gentlemen, We now have used transformer stations available Year of construction : 2004 Power : 1000KVA Primary voltage : 20kV Secondary voltage: 400V, Groupset: DYN5 Switchgear: SF6 Station Dimension : Length: 250 cm Width: 240 cm Height: 245 cm Weight: 11 ton At call Nationwide cheap delivery. If you have any further questions, please do not hesitate to contact Mr. Schmidt. Available Monday to Saturday from 8 a.m. to 8 p.m. CLOCK and in case of emergencies 24 hours
Transformer station transformer engmx ...