item-No.: 164262987 is deleted from the database!

10 similar machines:

date: 28.03.2024 item-No.: 163673263
approved
dealer
Machine: PRATT + WHITNEY FT8 Twinpac
used
Seller: Land-cn ROYCE POWER
Location:: 00000 Fanling
Price: 4.200.000 €

Pratt & Whitney gas turbine generator Model : FT8 Twin pac Power output : 48 MW Voltage : 11 KV Frequency : 50 Hz  ...

  • more information

approved
dealer
Machine: PRATT BURNED Durchmesser 250 mm
used
Price: 110 €

Three-jaw chuck, three-jaw lathe chuck -Chuck size: Ø 250 mm -Interchangeable jaws: without -Taper cone: Ø 105 mm -Hole circle: Ø 135 mm -Weight: 25 kg ...

  • more information

Machine: TAURUS 60 GAS TURBINE
New in: 1996
used
Seller: UCY Industrial GmbH
Location:: Vienna, Austria

Gas Turbine Data - Machine Type: Taurus 60 - Machine Version: T7301 Dry NOx - IGV Set: 5° - T5 Base: 1252°F - T5 Set Point: 1250°F Current operating hours: 28,000 (approximately 4000-6000 hours per year) Find more here - / Contact us at -  ...

  • more information

date: 08.09.2024 item-No.: 164553711
Machine: GE Frame 6B gas turbine
New in: 1981
used
Seller: UCY Industrial GmbH
Location:: Germany

2x GE Frame 6B gas turbines # Technical Summary Equipment Details - Gas Turbines: Two GE MS 6001 B gas turbines paired with AEG generators (Type S7102/2). - Operation History: - Commissioning: 1981 - Gas-fired Operation: Until 2005, primarily for base load (~7000 hours/year). - Operational Hours in Combined Cycle: - GT21: ~167,000 hours, ~1130 starts - GT22: ~159,000 hours, ~1180 starts - Retrofitted: In 1996 with water injection for NOx reduction. - Conversion: In 2007 to peak load operation using heating oil (HEL) with new steel chimneys and upgraded control systems to ABB Procontrol 14. - Operational Hours in Peak Load: - GT21: ~130 hours, ~177 starts - GT22: ~150 hours, ~1 ...

date: 29.08.2024 item-No.: 25486699
approved
dealer
New in: 1963
used
Seller: Land-de Joko Spezialtiefbau
Location:: 94256

Francis turbine, used 40 kW, 3 m³, height 2m Speed 106 / 375 RPM 69 HP, built in 1963 Generator Schorch GmbH Type KT 7315 s FB01 Z-Z 50 Hz, 512U/min 55kW  ...

  • more information

date: 29.08.2024 item-No.: 25486705
approved
dealer
Machine: KAPLAN Turbine
New in: 1963
used
Seller: Land-de Joko Spezialtiefbau
Location:: 94256

Kaplan turbine used 50 kW, 3 m³, height 2m Speed 150 / 460 RPM 70 HP, built in 1963 Generator Schorch GmbH Type KT7280S - DB05 Z-Z 50 Hz, 770 RPM 55kW  ...

  • more information

date: 13.08.2024 item-No.: 158896950
approved
dealer
Machine: HHI-BBC Turbine Housing HHI-BBC
used
Seller: Land-br THERMOSOLUTIONS
Location:: 22640 RIO DE JANEIRO
VS

HHI-BBC Turbine Housing RPM - 17400 Only the turbine hull.  ...

  • more information

date: 08.09.2024 item-No.: 164553035
Machine: ELIN KR 25 steam turbine
New in: 1964
used
Seller: UCY Industrial GmbH
Location:: Vienna, Austria
Price: 85.000 

Tapping back-pressure turbine with spur gearbox and generator Make: ELIN Type: KR 25 Rated power in relation to the generator terminals: 3800 kW Speed: l0000 rpm Steam inlet pressure max. : 37 Steam inlet temperature max. 44 degrees Tapping pressure max. : 24 Tapping temperature : 390 degrees Evaporation pressure : 2 Normal absorption capacity : 27 t/h Maximum absorption capacity : 32 t/h Gearbox Make Voith, St.Pölten Type D 64 Rated power: 5,700 HP Speed 10 OOO/1 5oo rpm Backpressure steam turbine + gearbox + synchronous generator incl. auxiliaries Find more here - /

1104 boilers
date: 18.03.2024 item-No.: 146534157
approved
dealer
Machine: FOSTER WHEELER, SIEMENS, BFB boiler &
New in: 2001
used
Seller: Land-de MET-TECH GMBH
Location:: 61381 FRIEDRICHSDORF

Qty. 1 Second-hand power plant including boiler (BFB – boiler: bubbling fluidized bed) Mfc.: Foster Wheeler, Siemens, Raumaster, YIT Corporation, Honeywell, Built: 2001, 2002, 2006, 2009 Revision: 2009 Insulation removed in 2018 BFB Boiler – 88 MW Steam turbine – 22.5 MW Main Steam Cycle BFB boiler K7 – Some parts removed and storaged indoor at the paper mill area – Boiler is made electrically safe (cables cut) – Dry conservation ongoing since 2014 (tubes filled with nitrogen, dry air circulation) – Steam Turbine VP4 (in storage) Generator (in storage) Power Plant – Function Primary function is to produce steam for the Paper Mill reliable and economically S ...

date: 25.10.2023 item-No.: 151372692
New in: 2001
used
Seller: Land-de Ahrend Consulting GmbH

Biomass Plant, 5 MWel, 50 Hz, yoc 2002, in operation Boiler • Technical data: - Fuel tank capacity: approx. 1 .300 m 3 - Exhaust gas volume 29,000 Nm3/h - Average combustion temperature of 900°C (850 for 2 s.) - Thermal power of the furnace 13 MW - 2 add. Burners 5 MW each - Average calorific value Hu 12,500 kJ/kg - Throughput capacity 3,991 kg/h - Boiler working pressure 41 bar - Superheated steam temperature 420°C - designed amount of steam 14 t/h - Fuels: RDF, wood chips, straw, remains of chipboard, choiceed waste Hours of operation of the entire plant appr. 120,000 hours Steam turbine - TWIN steam turbine KKK, type: CFR 3 / AFA 6 GTA  ...

You didn't find your wanted machine? send wanted inquiry to all dealers (no registration necessary)