Description: |
Steamturbine KK+K CFR5 G6a
Turbine
Operating Hours of Turbine: 30.000h
Back-pressure turbine
Manufacturer: Fa. KKK
First Start-up: 2002
Type: CFR5 G6a
Power Max: 2500 kW Operational efficiency: 2200 kW,
Revolution number: 23000 U /min,
Live steam pressure: 65 bar,
Live steam pressure temperature: 480 °C,
Evaporation pressure: 1-17 bar,
Investments in the year 2002 , Entire steam transforming station from
63 bar to 2,5 bar in the year 2002 renewed, El. Generator Fa. Leroy
Somer, el. Power 2 MW, 525 V, 2488 kVA, renewed, Entire measuring -,
governing and control of the turbine renewed, Steam turbine renewed
with
Energy Production
Installed boiler efficiency:
Boiler I , Hard coal, Steam generation: 20 t/h, 63 bar, 495 °C
Boiler II , Hard coalr Steam generation: 13 t/h, 34 bar, 425 °C
Boiler III: , Combination burner for oil and gas, L41215227 Steam
generation: 20 t/h, 17 bar, 285 °C
General overhaul of the entire plant from 2002 to 2004, Steam
generator renewed, automatic cole-loader and ashremoval plant renewed,
Water treatment plant renewed, entire instrumentation renewed, Flue
gas purification plant Fa. Lurgie of 1991 - 2001 renewed
Errors excepted!
seller offer No. resale N0100
|